Jan
30

4.25.08 MANNA Renovation Update

Posted by admin Comments (0)


MANNA’s kitchen renovations are almost complete – this is week 8 of a 9 week construction project. The epoxy non-slip flooring for the kitchen has been poured and and painting has begun. Campenella Construction is preparing to install the ovens, kettles, and dishwashing equipment. Outside, the frame for the new MANNA signage will create greater visibility for the organization at 12 S. 23rd Street. Tour the facility with CEO Richard Keaveney and Executive Chef Keith Lucas.

Categories: Kitchens
Jan
30

How To: Install Blucher Shower Drain

Posted by admin Comments (0)


This video demonstrates how to install a flanged Blucher Waterline Vinyl shower drain on a wooden floor. A great “How To” for homeowners and contractors looking to remodel existing bathrooms. Visit Trench Drain Systems at www.Trenchdrain.biz to learn more about shower drains.

Categories: Bathrooms
 

Powered by Yahoo! Answers